PESCO area - 5 peak-sun hrs/day

Solar calculator for Peshawar

Peshawar solar sizing should be conservative enough for seasonal variation while still accounting for high summer cooling and backup needs. Use this PESCO page to compare system size, generation, and payback.

Open free online calculatorView estimates
City estimate

Peshawar solar estimate at a glance

This shared model uses 5 peak-sun hours per day, a 75% performance ratio, 55% direct self-consumption, Rs. 60/unit retail value, and Rs. 8.13/unit export credit. These are illustrative assumptions, not an official flat PESCO tariff. Enter the actual units from your bill, then ask your installer to recalculate savings using your agreement rates and measured daytime load.

DISCO
PESCO
Peshawar Electric Supply Company
Peak sun
5
hours per day used for sizing
Province
Khyber Pakhtunkhwa
geographic context
Default type
Hybrid
on-grid costs are shown below too
Illustrative load profiles: these scenarios use the shared calculation model. They are not monitored local installations, measured bills or installer quotations. Shops and industrial sites need their actual tariff and operating schedule checked separately.
Use caseMonthly unitsHybrid sizeCost estimateMonthly generationSavingsPayback
Small home350 kWh4 kWRs. 610K - Rs. 730K450 kWhRs. 16,5003.3 years
Family home600 kWh6 kWRs. 910K - Rs. 1.09M675 kWhRs. 24,7003.3 years
Large home900 kWh8 kWRs. 1.21M - Rs. 1.45M900 kWhRs. 33,0003.3 years
Shop or office1,500 kWh14 kWRs. 2.13M - Rs. 2.54M1,575 kWhRs. 57,7003.3 years
System prices

Peshawar 5 kW, 7 kW, 10 kW, and 15 kW solar cost guide

These are starting budgets from the shared Pakistan model rather than a local supplier quotation survey. Request separate prices for roof repairs, elevated structures, coastal protection, the exact battery capacity and utility works.

5 kW

On-grid range
Rs. 410K - Rs. 500K
Hybrid range
Rs. 760K - Rs. 910K
Estimated monthly generation
563 kWh

7 kW

On-grid range
Rs. 580K - Rs. 690K
Hybrid range
Rs. 1.06M - Rs. 1.27M
Estimated monthly generation
788 kWh

10 kW

On-grid range
Rs. 830K - Rs. 990K
Hybrid range
Rs. 1.52M - Rs. 1.82M
Estimated monthly generation
1,125 kWh

15 kW

On-grid range
Rs. 1.24M - Rs. 1.49M
Hybrid range
Rs. 2.28M - Rs. 2.72M
Estimated monthly generation
1,688 kWh
Local sizing notes

What changes in Peshawar

Peshawar uses a 5 peak-sun-hour planning default. If backup is the main goal, system size and bill savings answer only part of the question. Write down the circuits and hours you need during an outage, then check whether daytime charging can replenish the battery while those circuits continue running.

Dust, roof access, parapet shade, and security of outdoor equipment should be reviewed during the site survey.

HayatabadUniversity TownSaddarGulbaharWarsak RoadRing Road

Area names are examples for survey planning. Verify the actual electricity supplier on your own bill.

Net billing

PESCO savings logic

PESCO customers should estimate direct use and exported units separately. A battery may be justified by backup need even when pure payback favors on-grid.

The calculator separates direct savings from export credit because imported units and exported units have different cash values. This is why two Peshawar homes with the same kW size can have different payback.

Site survey

Evidence to request for a Peshawar roof

Use your own bill, roof photographs and operating schedule to turn these local checks into a written design. Ask for the evidence behind each proposal before comparing total prices.

Write a critical-load schedule in watts and hours

List fans, lights, fridge, internet and any pump separately, with simultaneous power and required runtime. Ask for usable battery energy after the reserve setting and conversion losses, plus the inverter's continuous and surge limits. Battery nameplate kWh alone does not guarantee a backup duration.

Check recovery after a low-generation day

Ask the installer to show a winter or cloudy-day energy budget: household direct use, battery charging and any permitted grid charging. Record the reserve setting and who can change it. More battery capacity needs enough charging energy; it cannot compensate indefinitely for a shaded array.

A comparison to make before you buy

For a Hayatabad home prioritizing fans, lighting and a fridge, compare a dedicated essential-circuit backup with a whole-house backup. Require an explicit load schedule and winter recharge plan for both. The payback table covers the modelled electricity benefit; it does not place a cash value on avoided interruptions.

Quote checklist

Before you sign a Peshawar solar quote

Keep every installer on the same scope. Otherwise a cheaper quote may simply be missing protection gear, stronger mounting, monitoring, battery wiring, or PESCO paperwork.

1

Confirm the PESCO filing scope, fees, drawings, testing, inspection, and bidirectional meter timeline.

2

Ask for panel brand, exact model, wattage, serial verification, product warranty, and performance warranty.

3

Require inverter make, model, warranty channel, monitoring access, surge protection, earthing, and breaker details.

4

Separate panels, inverter, mounting, protection gear, battery, labor, and net-billing filing into line items.

5

Ask Peshawar installers about battery sizing, critical-load wiring, inverter protection, monitoring, and PESCO application handling.

FAQ

Peshawar solar calculator questions

Answers to local planning questions before you request a quote.

How should backup hours be checked for a Peshawar home?

Use simultaneous load power, runtime, usable battery energy, reserve settings and inverter limits. The battery's nameplate size alone is insufficient.

Can a bigger battery solve a low-sun problem?

It increases storage but still needs enough recharge energy. Compare loads and charging on a winter or low-generation day before increasing capacity.

Official sources

Verify the application and generation assumptions

Use the original utility sources for application rules, fees and approval steps. The sun-hours and price bands on this page are this site's planning assumptions; they are not an official tariff or a measured local yield dataset.

PESCO official net-billing portal

PITC lists PESCO among its supported utilities and links applications, tracking, NEPRA regulations, contact information and transformer checks. Read the current notices before a new application or capacity change.

Check monthly yield in Global Solar Atlas

Select your roof's location and compare monthly PVOUT for the proposed orientation and tilt. The Atlas model excludes building and vegetation shade, so a local shade survey is still needed. Its kWh/kWp yield is a different quantity from this calculator's peak-sun-hour input.

Read the Atlas methodology

Official links reviewed: 6 October 2026. See the calculator methodology and limits

More cities

Compare nearby solar calculator pages

Compare roof, load and application checks across locations. The shared price model does not establish differences in actual local market prices.

Calculate your Peshawar solar system from your bill

Start with bill amount, city, and DISCO. No login required.

Open online calculator
WhatsApp